Outcome 1 Opens and A2, The Mock Review

A Level Art & Design · Final Outcomes

Aoki Shukuya, Double Album of Landscape Studies after Ikeno Taiga, 18th century
Aoki Shukuya, Double Album of Landscape Studies after Ikeno Taiga, 18th century

A Level Art & Design

At a glance

Sessions5 days (W8)
DatesMon 18 Oct → Fri 22 Oct (projected)
AO focusAO1–AO4 (whole-investigation review); AO3/AO4 (outcome 1 build)
DeliverableFinal outcome 1 planned and its build opened; the whole investigation sequenced as if submitting
GradedCS5 Tue 19 Oct (outcome 1 plan) · A2 Thu 21 Oct (AO1–AO4, mock portfolio review)
Homework≤30 min: act on one A2 target before the Seniors week, the studio does not wait

Objectives

By the end of this lesson, students can, observably:

  1. Plan final outcome 1 so that composition, palette and materials are decided before the build
  2. Sequence the whole investigation as if submitting it
  3. Sit A2 as a dress rehearsal, and recognize it as portfolio material for applicants

Goal

Begin Unit 5 by planning final outcome 1. Decide its composition, palette, and materials, then start the build before the Seniors’ Days remove next week’s classes.

On Thursday, A2 reviews the whole investigation so far. Arrange it as you would for submission. This rehearses the December submission and provides portfolio material for applicants.

How it runs

  • Mon 18 Oct, plan final outcome 1. Composition, palette and materials decided now; solve it small first with supporting thumbnails.
  • Tue 19 Oct, studio: supporting thumbnails; CS5. The plan proven at thumbnail scale.

CS5 is the outcome 1 plan, marked.

  • Wed 20 Oct, studio: outcome 1 build opens. The build starts before the Seniors week removes W9.
  • Thu 21 Oct, A2: mock portfolio review. The whole investigation, sequenced as if submitting, marked against AO1–AO4, the dress rehearsal and an application asset.
  • Fri 22 Oct, feedback and independent targets. Targets set for the Seniors week, when there is no class; the studio does not wait.

Key content: the dress rehearsal, timed before W9

  • ◆ A2 must land before the Seniors week removes W9, it sits Thursday because the autumn field trip may take Friday, and it can’t slip into a week with no teaching.
  • The A2 review is sequenced as a real submission: the rehearsal and the portfolio-application asset for Oxbridge/ED applicants.
  • Outcome 1 is planned so the day itself is execution, not invention, composition, palette and materials fixed in advance.
  • W9 (Seniors’ Days) has no teaching; it becomes an independent-production week with targets set today. Building resumes in Building Outcome 1.

Practice

Try each question before you open its answer. The dress rehearsal week runs on decisions already made.

1. What must be decided before outcome 1’s build opens, and why?

Answer: Composition, palette, and materials, proven small in the supporting thumbnails. The build day is execution, not invention: planning these decisions first reduces the risk of wasting materials or production time.

2. What is A2, and why does it earn double duty?

Answer: A mock portfolio review: the entire investigation sequenced as if submitting, marked against all four AOs. It is the dress rehearsal for December, and the sequenced review doubles as portfolio material for university applicants. The same sequence serves both purposes.

3. Why does A2 sit on Thursday of this particular week?

Answer: Because the Seniors’ Days remove all of next week, and the autumn field trip may take Friday. The review must take place before that week without teaching.

4. What is the Seniors week, for this course?

Answer: An independent-production week. There are no classes. On Friday, the teacher sets independent-production targets so you can continue the outcome build during the week.

5. Before the Seniors week starts, act on one A2 target: the most movable one, acted on while the review is fresh. The rest are dated into the independent-week targets.