Assembly and A4, the Submission Package
At a glance
| Sessions | 5 days (S9) (pinned, floats with the test) |
| Dates | Mon 17 Apr → Fri 21 Apr (projected) |
| AO focus | AO4 Present |
| Deliverable | The final piece photographed; the submission package assembled exactly as the Cambridge specification orders it; supervised QC line by line |
| Graded | CS7 Thu 20 Apr (submission checklist and reflection) · A4 Fri 21 Apr (AO1–AO4), the package; the piece itself is externally marked |
| Homework | ≤30 min: the submission checklist, every item present, ordered and labeled |
Objectives
By the end of this lesson, students can, observably:
- Photograph the final piece as the version the examiner sees
- Assemble the package exactly as the Cambridge specification orders it
- Pass supervised QC line by line and sit A4 on the packaging and completeness
Goal
Photograph the test piece accurately for the examiner and assemble the submission package in the order required by the Cambridge specification. Check every item under supervision.
On Friday, A4 assesses the package’s completeness and presentation as the internal grade layer. Cambridge externally marks the final C2 piece itself. A4 does not mark the artwork a second time.
How it runs
- Mon 17 Apr, test debrief and package plan. What the test produced, and the plan for the package around it.
- Tue 18 Apr, photograph the final piece. The version the examiner sees, shot to the specification, corrected without flattering it.
- Wed 19 Apr, assemble the submission package. Ordered exactly as specified, sequence, labels, limits.
- Thu 20 Apr, quality control, supervised; CS7. The specification, line by line.
CS7 is the submission checklist and reflection.
- Fri 21 Apr, A4: submission package due. The internal grade layer, marked across AO1–AO4; no edits after.
Cambridge marks the piece.
Key content: the package is graded; Cambridge marks the piece
- A4 is the internal grade layer, the submission package’s completeness and order; the final piece is externally marked by Cambridge.
- The package matches the specification exactly, sequence, labels and limits, because a package that breaks the specification loses marks the artwork earned.
- CS7 and A4 are pinned but float with the test: on reading A the whole tail pulls forward one week.
- Board handover, the checklist covering C1, C2 and C3 together, follows in Board Week, Handover and Records.
Practice
Try each question before you open its answer. The packaging is graded. Treat it as work.
1. What does A4 grade, and what does it deliberately not grade?
Answer: The submission package: its completeness and order, as the internal grade layer across AO1 to AO4. It does not grade the artwork twice. The final C2 piece is marked externally by Cambridge, so A4’s job is everything around it.
2. State the specification rule and its price.
Answer: The package matches the Cambridge specification exactly: sequence, labels, limits. A package that breaks the specification loses marks the artwork earned. Check the specification line by line during QC.
3. How is the final piece photographed?
Answer: As the version the examiner sees: shot to the specification, corrected without flattering it. The piece spent fifteen supervised hours becoming what it is. The photograph must represent the finished piece accurately.
4. What is Thursday’s supervised QC, mechanically?
Answer: The specification, line by line, against the assembled package, with CS7 collecting the checklist and reflection. Every finding is a fix made before Friday. After Friday’s A4 there are no edits, and Cambridge takes it from there.
5. The homework is the submission checklist run by you before it is run on you: every item present, ordered, and labeled. Read the labels out loud. Reading aloud can help you notice labeling errors.