Supervised Test & Submission
Unit plan
Complete the test, assembly, and board-submission stage under AO4 Present. The schedule calls this “Test, Assembly and Board”.
Read the complete unit plan
A Level Art & Design · Semester 4 Plan
What this unit does
Complete the test, assembly, and board-submission stage under AO4 Present. The schedule calls this “Test, Assembly and Board”. Make your planned outcome during the 15-hour supervised test. Your work is stored securely between sittings. You cannot access it or add to it.
Photograph the final piece and assemble the package in the order required by the Cambridge specification. Check it line by line under supervision, then hand it to the exams officer. For the linear entry, C1, C2, and C3 all reach the board in the same window. A4 assesses the submission package for your internal grade. Cambridge externally marks the final piece itself.
Dates & span
This unit runs in weeks S7/S8–S10 (projected). It includes the 15-hour test plus 10 sessions. The timing depends on the mock window. There are two possible schedules:
- The test runs in S8, Mon 10 Apr → Fri 14 Apr, in 5 × 3h sittings.
- The test runs in S7 around Qingming, in 4 × 3h45 sittings. The rest of the unit moves forward one week.
The schedule will be confirmed in class. All S4 dates are projected and may shift when the school publishes the calendar for that period. See the semester plan.
Sequence of work
| Code | Session | Focus |
|---|---|---|
| Test | The supervised test, 15 hours | Make the planned outcome. Do not invent anything under supervision. |
| U5·L1 | Test debrief and package plan | Review what the test produced. |
| U5·L2 | Photograph the final piece | Record the version the examiner sees. |
| U5·L3 | Assemble the submission package | Order it exactly as specified. |
| U5·L4 | Quality control, supervised | Check the specification line by line. |
| U5·L5 | A4: Submission package due | The package receives an internal grade. Cambridge marks the piece. |
| U5·L6 | Gap repair for the board, supervised | Address only the gaps identified in quality control. |
| U5·L7 | Final checks against the specification | Check every page, label and limit. |
| U5·L8 | Handover to the exams officer | Use the checklist for C1, C2 and C3. |
| U5·L9 | Portfolio photography for records | Keep a photographic record of the submitted work. |
| U5·L10 | Course close and release | The board has the submission. |
Assessment
A4 is due Fri 21 Apr, with the date moving if the test moves. Submit the complete C2 submission package for your internal grade. It is marked against AO1–AO4. No edits are allowed afterward. The final C2 piece itself is externally marked by Cambridge.
CS tasks:
- CS7: Thu 20 Apr, submission checklist and reflection. The date moves if the test moves.
- CS8: Thu 27 Apr, portfolio photography for student records.
See the full register.
Key content
- Nothing is invented under supervision. Follow the plan marked at A3.
- Storage between sittings is secure and documented. There is no access and there are no additions or exceptions.
- The package must match the specification exactly. Marks and samples must reach the board by approximately the end of April. The exact deadline will be confirmed in class.
- If the test runs in S7, the whole unit moves forward one week.