Media Studies · Sample Blog

Media Studies · What goes on the blog · Component 1, the Foundation Portfolio

At a glance

WhatThis model shows the course’s blog sequence. Record each task as a short post on the day you actually work.
WhoThe student is invented. The task requirements belong to our course.
Current guideUse the blog map for the full evidence requirements and the current assessment briefs for deadlines.

Are the exercises on the blog?

Yes. Keep useful preliminary work on the blog and explain what it teaches your opening. The November 13 Opening Research Checkpoint uses seven evolving records. Link existing work. The Film Letter keeps its own A1 grade. The short continuity test is formative practice, not an eighth checkpoint post.

The current sequence

These dates identify teaching or submission milestones. A post records the day you actually worked. Add an honest note if you publish it later. Do not backdate it.

TimingModel post
September 10First photograph: explain the frame and what it does.
September 14Preliminary exercise 1: include the ten-photo story, captions and contact sheet.
September 14Anchorage: include one photograph, one caption, and your reading before and after the caption.
September 21Parasite: include six frames, camera analysis and one application to your opening.
Late completion, under the existing taskComplete the A1 Film Letter and its rationale under the original October 8 at 08:00 deadline. Later submissions are late. Completed films are screened and discussed as they arrive.
October 12–16Develop opening research and a provisional concept note: person, place, action, tone, information and a research question. Keep these in the same evolving record. Script and storyboard follow November 18–19. Relevant production tests follow from November 20.
October research time and November 11 clinicResearch three openings. Select three frames from each, nine total. Explain one possible application per opening.
October 14 onward; review November 2Develop the working design board from reference research and concept notes.
November 9–13Prepare the titles/application study for the November 11 clinic. Submit the seven-part record at the November 13 Course Skills checkpoint. No separate checkpoint post is needed.
November 2Apply genre and narrative choices to your direction: a clear action, a possible audience response and an unresolved question.
From November 20, after script/storyboard reviewComplete a short continuity test. Compare held and broken continuity. Add useful evidence to the existing process record.
November planning workshopsRecord audience, idea development, institution and ident. Keep each decision and its evidence clear.
November 16Record who appears, who is absent and the casting decision.
November 18Develop the script and storyboard. Record the paired review and fixes for the November 19 submission.
November 20Record casting, location recce, risk and test-shot evidence.
November 25Include the pitch, response cards and resulting fixes.
November 27A3 assesses research and planning. The final film is not due in November.
December 11 and 23Develop the animatic and call sheets toward the December 23 pre-production gate.
January 24–February 21, within your approved individual planWrite one production post per actual shoot day, with the decision, result and next action.
SpringRecord footage reviews, an editing diary, rough cut, response cards, revised cut and final export at the set milestones.
SpringComplete all four creative critical reflection answers. Ground them in your final opening and process evidence. Choose suitable digital formats. You may use separate applications, but four tools are not required.

Three things to notice

Guide: What goes on the blog (PDF, seven pages)

  • Keep ordinary posts short. Use the task’s required length where it differs: A1 keeps its approximately 250-word rationale and the Parasite paragraph its 120–180 words.
  • End a post about an exercise or another film with what it teaches your own opening.
  • Explain changed decisions in new posts. Keep the initial direction so the blog shows how research and testing changed the plan. Final shot-list/location approval is at the December 23 gate.

Use this structure to document your own film, with your own decisions and evidence.